i. This Quarterly
Environmental Monitoring and Audit (EM&A) Summary Report is prepared for
Contract No. SPW 07/2020 “Environmental Team for Construction of Yuen Long
Effluent Polishing Plant Stage 1”. Drainage Services Department (DSD) has
appointed Fugro Technical Services Limited (FTS) to undertake the Environmental
Team services for the project and implement the EM&A works.
ii. This is the 4th Quarterly EM&A Summary
Report for the Contract which summaries findings of the EM&A programme
during the reporting period from 1 January 2022 to 31 March 2022. As informed
by the Contractor, major activities in the reporting period were shown in
section 1.4.1.
iii. The EM&A
methodology has been effective in monitoring the environmental impacts of the
Project and the effectiveness of the mitigation measures. The data collected
were useful in determining whether the Project had caused unacceptable impacts
on the sensitive receivers. Analysis of all EM&A data collected throughout
the baseline and the impact periods demonstrated the environmental
acceptability of the Project.
Breaches of Environmental Quality Performance
Limits (AL levels)
iv. No Action and
Limit Level exceedance was recorded for air quality monitoring and construction
noise monitoring in the reporting period.
v. No Action and
Limit Level exceedance was recorded for water quality in the reporting period.
vi. No Action / Limit
Level exceedance was recorded for noise levels at stations (NMS1 and NMS2) in close proximity to the active ardeid night roosts during the reporting period.
vii. No Action / Limit
Level exceedance for the ecological monitoring of birds during the reporting period.
viii. No corrective
actions were required according to the Event and Action Plans for the
Monitoring Parameters.
Land Contamination
ix. Regular site
inspection was carried out to ensure the recommended mitigation measures are
properly implemented. Site investigation (SI) work was completed by 6 January
2022 and the signed final Contamination Assessment Report (CAR) for Main
Storeroom & Workshops was submitted to EPD on 1 November 2021. The signed
final Contamination Assessment Report (CAR) for Mechanical Workshop was
submitted to EPD on 23 November 2021. No contaminated soil and ground water was found within the Main Storeroom & Workshop and the
Mechanical Workshop, and no remedial action is required for both locations.
While the laboratory results of sampling works show that there is no
contaminated soil or groundwater within the Waste Storage Area, the findings
are summarized in the draft CAR for the area which is under review and will be
submitted to EPD.
Complaint Log
x. No complaints were
received in the reporting period.
Notifications of any Summons and Successful
Prosecutions
xi. No notifications
of summons and prosecutions were received in the reporting period.
Reporting Change
xii. There were no
reporting changes during the reporting period.
2. SUMMARY
OF EM&A REQUIREMENTS AND MONITORING RESULTS
6. NON-COMPLIANCE, COMPLAINTS,
NOTIFICATIONS OF SUMMONS AND SUCCESSFUL PROSECUTIONS
7. IMPLEMENTATION
STATUS OF ENVIRONMENTAL MITIGATION MEASURE
Tables
Table 1.1 – Contact Information of Key Personnel
Table 1.2 – Main Construction Works Carried out in the Reporting
Period
Table 2.1 – Air Quality and Noise Monitoring
Location
Table 2.2 – Coordinates of Water Quality Monitoring
Locations
Table 2.3 – Summary of Water Quality Exceedance
Table 5.1 – Observations and Recommendations of
Site Audit
Table 5.2 – Waste Generated by the Construction
and Disposal Ground
Table 7.1 – Summary of EP Submissions Status
Figures
Figure
1 Location of
Proposed Yuen Long Effluent Polishing Plant
Figure 2 Location
of Construction Dust Monitoring Stations
Figure 3 Noise
Monitoring Locations
Appendices
Appendix A Construction
Programme
Appendix B Project
Organization Chart
Appendix C Action
and Limit Levels
Appendix D Graphical
Presentation of Monitoring Data
Appendix E Event
and Action Plan
Appendix G Implementation
Status of Environmental Mitigation Measures